Route Survey, Topograpical Survey, IEE, EIA including RAP and Feasibility Study of “Expansion and Strengthening of power network project under Chittagong
2016 - Till date
Inception Report Preparation of feasibility study (developed the methodology of feasibility study, alternative analysis etc.); Administrative activities like client handling, data collection etc. as Project leader.
IEE, EIA report writing (represent project description clearly so that multidisciplinary team member can understand project intervention easily; risk, hazard analysis and suggest the mitigation measures).
FS report preparation (necessary data collection, data analysis, finalize scope of work, preparing electrical design description, cost estimation etc.).